top of page


SIMPLIFIED: "Determining to Divide: How Do Cells Decide?"
Link to article: https://pmc.ncbi.nlm.nih.gov/articles/PMC3456348/ The image above was taken from: https://www.britannica.com/science/cell-biology/Cell-division-and-growth Cells must be carefully controlled when they divide so their genetic material is copied correctly. If this does not happen correctly, different diseases such as cancer can be formed. There are immune cells called T cells that receive growth signals from a protein called interleukin-2, or Il-2. This is impo


SIMPLIFIED: "How fingerprints form was a mystery - until now"
Link to article: https://www.sciencenews.org/article/fingerprints-form-mystery Note: The image above was taken from the original article. We will discuss how fingerprints form. Fingerprints are patterns of lines and curves you see on the tips of your fingers. They begin to form before we are even born, while we are developing in the womb. Scientists have found out that fingerprints are formed because of different interactions between molecules in the skin. There are three mo


SIMPLIFIED: "Explainer: How photosynthesis works"
Link to article: https://www.snexplores.org/article/explainer-how-photosynthesis-works Note: This image was taken from the original article. How does Photosynthesis work? Photosynthesis is the process that is needed for plants to make their own food. Plants need sunlight, water, and carbon dioxide to do this. The process includes plants making a type of sugar called glucose, which is used for the plant's energy and growth. Along with this, plants also release oxygen into the


SIMPLIFIED: "DNA Repair - The Cell"
Link to article: https://www.ncbi.nlm.nih.gov/books/NBK9900/ This image was taken from: https://medlineplus.gov/genetics/understanding/basics/dna/ What is DNA? DNA is one of the most essential components of an individual, as it is the hereditary molecule in humans that stores the genetic instructions needed for growth, development, and functioning, but it can also be easily damaged. Factors that can harm DNA include sunlight, harmful chemicals, and normal cellular processes.


SIMPLIFIED: "From Vaccines to Memory and Back"
Link to article: https://pmc.ncbi.nlm.nih.gov/articles/PMC3760154/ This image was taken from: https://cepi.net/mrna-vaccines-what-they-are-and-what-they-are-not Vaccines are important for every individual to take, but why? That is what we are going to be discussing in this article. Vaccines help the immune system prepare to fight a germ before a person encounters it. They are used to weaken or inactivate germs or parts of them. This allows the body to have a chance to build p


SIMPLIFIED: "Antibiotic Resistance"
Link to article: https://www.ncbi.nlm.nih.gov/books/NBK513277/ This image was taken from: https://www.pihhealth.org/wellness/articles/antibiotic-resistance-what-you-need-to-know/ How do antibiotic resistance develop? Antibiotic resistance occurs when bacteria can survive medicines that should have killed them or stopped their growth. When antibiotic resistance develops, it makes it harder to treat bacteria infections. Resistance can develop through many ways, one of which c


SIMPLIFIED: "About Chronic Diseases"
Link to article: https://www.cdc.gov/chronic-disease/about/index.html Note: The image above was taken from the original article. Let’s talk about a public health issue: chronic diseases. Chronic diseases are health conditions that last at least one year and have others have continued medical care, limit everyday activities, or both. Some examples of chronic diseases are heart disease, cancer, and diabetes. Because of these chronic diseases, many individuals have had a higher


SIMPLIFIED: American Public Health Assocation
Link to website: https://www.apha.org/topics-and-issues Note: This image was taken from the APHA website. Let’s talk about the American Public Health Association. The American Public Health Association talks about many issues that affect the health of communities. Their topics show that public health includes much more than treating people when they become sick. They also talk about the environments, resources, and politics that affect everyday life. One major area is diseas


SIMPLIFIED: "What Is Public Health?"
Link to article: https://www.cdcfoundation.org/what-public-health The image above was taken from: https://www.news-medical.net/health/What-is-Public-Health-and-Why-is-it-Important.aspx What is Public Health? Public health is basically helping whole communities stay healthy. Examples of communities are neighborhoods, a city, a country, or people around the world. Public health is focused on preventing illness and injury and creating conditions that help people live healthier


SIMPLIFIED: "14.2: Oxidation-Reduction Reactions"
Link to article: https://chem.libretexts.org/Bookshelves/Introductory_Chemistry/Book%3A_Beginning_Chemistry_(Ball)/14%3A_Oxidation_and_Reduction/14.2%3A_Oxidation-Reduction_Reactions Note: The image above was taken from the original article. Have you ever wondered what happens when magnesium reacts with chlorine? Well, to understand the answer to this, it is important to understand that electrons move between the atoms, changing neutral elements into charged ions. This is cal


SIMPLIFIED: "5.4: A Molecular View of Elements and Compounds"
Link to article: https://chem.libretexts.org/Bookshelves/Introductory_Chemistry/Introductory_Chemistry_(LibreTexts)/05%3A_Molecules_and_Compounds/5.04%3A_A_Molecular_View_of_Elements_and_Compounds Note: The image above was taken from the original article. Let’s think about a question: what do helium, oxygen, water, and table salt all have in common? Well, all of those elements are something called pure substances, but their particles are organized very differently. Atomic el


SIMPLIFIED: "15.3: Acid-Base Titration Curves"
Link to article: https://chem.libretexts.org/Bookshelves/General_Chemistry/Map%3A_Principles_of_Modern_Chemistry_(Oxtoby_et_al.)/Unit_4%3A_Equilibrium_in_Chemical_Reactions/15%3A_AcidBase_Equilibria/15.6%3A_Acid-Base_Titration_Curves Note: The image above was taken from the original article. Here’s a question to think about: What happens to pH as a base is added to an acid? To visualize this, a titration curve is used to show the change by plotting pH against the volume of ti


SIMPLIFIED: "Aqueous Solutions of Salts"
Link to article: https://chem.libretexts.org/Bookshelves/Physical_and_Theoretical_Chemistry_Textbook_Maps/Supplemental_Modules_(Physical_and_Theoretical_Chemistry)/Acids_and_Bases/Acids_and_Bases_in_Aqueous_Solutions/Aqueous_Solutions_Of_Salts Note: The image above was taken from the original article. You might wonder if pH remains unchanged in every salt when it is mixed with something else. The short answer to whether the pH remains unchanged is no, but it is more complicat


SIMPLIFIED: "Atomic Radii"
Link to article: https://chem.libretexts.org/Bookshelves/Physical_and_Theoretical_Chemistry_Textbook_Maps/Supplemental_Modules_(Physical_and_Theoretical_Chemistry)/Physical_Properties_of_Matter/Atomic_and_Molecular_Properties/Atomic_Radii Note: The image above was taken from the original article. Let’s think about a question: Are all atoms the same size? The answer is no, but their sizes vary in a predictable way across the periodic table. Atomic radius is the term used to de


SIMPLIFIED: "Le Chatelier's Principle and Dynamic Equilibria"
Link to article: https://chem.libretexts.org/Bookshelves/Physical_and_Theoretical_Chemistry_Textbook_Maps/Supplemental_Modules_%28Physical_and_Theoretical_Chemistry%29/Equilibria/Le_Chateliers_Principle/Le_Chatelier%27s_Principle_and_Dynamic_Equilbria This image was taken from: https://sciencenotes.org/le-chateliers-principle/ Chemical reactions do not always finish with every reactant turning into a product. For example, in a closed system, some reach something called dynam


SIMPLIFIED: "3.13: Titrations"
Link to article: https://chem.libretexts.org/Bookshelves/General_Chemistry/ChemPRIME_(Moore_et_al.)/03%3A_Using_Chemical_Equations_in_Calculations/3.13%3A_Titrations Note: The image above was taken from the original article. One technique that chemists use to find the concentration of an unknown solution is titration. Titration uses a measured chemical reaction to reveal how much substance is present. During a titration, a solution with a known concentration, which is called


SIMPLIFIED: "9.1: Acid and Base Strength"
Link to article: https://chem.libretexts.org/Courses/University_of_Kentucky/CHE_103%3A_Chemistry_for_Allied_Health_(Soult)/09%3A_Equilibrium_Applications/9.01%3A_Acid_and_Base_Strength Note: The image above was taken from the original article. Acids and bases can behave very differently even when equal amounts are dissolved in water. Acids' and bases’ strengths are dependent on how readily they form ions or transfer protons. Strong acids, such as hydrochloric acid, transfer t


SIMPLIFIED: "8.5: Autoionization of Water and pH"
Link to article: https://chem.libretexts.org/Courses/Grand_Rapids_Community_College/CHM_120_-_Survey_of_General_Chemistry(Neils)/8%3A_Acids_and_Bases/8.05%3A_Autoionization_of_Water_and_pH Note: The above image was taken from the original article. Even though most water molecules remain unchanged, a tiny fraction exchange protons with each other. This is called autoionization. It produces hydronium ions and hydroxide ions: H₂O + H₂O ⇌ H₃O⁺ + OH⁻ One water molecule donates a p


SIMPLIFIED: "8.5: Acid-Base Definitions"
Link to article: https://chem.libretexts.org/Courses/University_of_Kentucky/CHE_103%3A_Chemistry_for_Allied_Health_(Soult)/08%3A_Properties_of_Solutions/8.05%3A_Acid-Base_Definitions Note: The above image was taken from the original article. Here’s a question to think about: Why does lemon juice taste sour, while cleaning products are basic? The answer to this question comes from looking at the behavior of how acids and bases interact with water and transfer hydrogen ions. T


SIMPLIFIED: "Ice Tables"
Link to article: https://chem.libretexts.org/Bookshelves/Physical_and_Theoretical_Chemistry_Textbook_Maps/Supplemental_Modules_%28Physical_and_Theoretical_Chemistry%29/Equilibria/Le_Chateliers_Principle/Ice_Tables Note: The image above was taken from the linked article. When a reversible reaction reaches equilibrium, how can we figure out the concentrations of the substance involved? An ICE table is the tool used to help organize the information needed to solve the problem.
bottom of page

